Built in the summer of 2004. Concrete block ground floor rendered with prestressed concrete ceiling-floor over.
Second and third floors- steel portal, treated framing, Exterior walls-flexible plaster system on cavity. shingle roof.
Sea views, low maintenance materials.
Side view, showing the multi-level structure.

